PV GAS promotes operation and maintenance (O&M) in 2025
PV GAS has launched a 2025 Operation and Maintenance (O&M) campaign, aiming to enhance maintenance quality, ensure safety, efficiency, and adherence to schedule.
In 2025, PV GAS’ O&M projects are to ensure the safety and efficient operation of the national gas systems, including:
• Ham Rong - Thai Binh gas system (scheduled for late May 2025)
• Cuu Long and PM3 - Ca Mau (scheduled for August 2025)
• NCS2 - GPP Dinh Co and valve stations of PV GAS South East Transportation Company (scheduled for September 2025)
• Rong Platform (scheduled for November 2025)
To successfully complete all O&M projects and meet optimal standards in production and business—PV GAS has set specific goals for each project:
• Zero labor accidents or operational incidents during the entire O&M process.
• Ensure quality and complete 100% of planned O&M items on schedule.
• Be ready to receive gas immediately upon resumption of supply Vietsovpetro and other gas field operators.

PV GAS O&M
Following the guidance of PV GAS’ Labor Union and Youth Union, the promotion of O&M has been rolled out across all units. The Labor Union and Youth Union have collaborated with management to sign commitments and rally around the action slogan: "Safety – Quality – Schedule – Efficiency," aiming to excel in all O&M tasks and contribute to the stable, uninterrupted production and business operations of PV GAS.
This movement not only enhances workers’ sense of responsibility but also contributes to environmental protection, optimizes production efficiency, and minimizes operational risks.
This initiative holds significant meaning, actively supporting PV GAS’ journey to reaffirm its pioneering role in Vietnam’s gas industry. Through practical and effective activities, PV GAS demonstrates its strong commitment to ensuring national energy security while improving service quality, optimizing operational costs, and increasing economic value.